Rotherham

Air Handling Unit Movement & Positioning

Controlled movement and positioning of six Air Handling Units, each approximately seven metres long, using a carefully prepared route through the site.

Back to Projects

Project overview

Rotherham

Six Air Handling Units, each approximately seven metres long, were moved and positioned within the site. Existing racking was removed to create the movement route, with two scissor lifts and four chain blocks used to control the operation.

Location
Rotherham
Scope
6 Air Handling Units · approximately 7m long
Equipment
2 scissor lifts · 4 chain blocks